- The Shinglebolt Slough project is a mainstem, off-channel, riparian, and floodplain restoration project. The project is located along the Skykomish River mainstem and active floodplain. Several project alternatives will be evaluated – looking at existing flood and infrastructure conditions, modeled river hydrology, and predicted changes in river morphology – to determine ecological and flood benefits, as well as infrastructure resiliency needs.
- Montlake Bridge (historylink.org)
The Montlake Bridge spanning the Montlake Cut in Seattle was completed in 1925, the last-built and easternmost of four double-leaf bascule bridges that carry vehicle and pedestrian traffic across the Lake Washington Ship Canal. It is set apart from its sister bridges by both its Gothic architectural details and its mechanical design, and has been listed on the National Register of Historic Places since 1982.